Projects
projects based on power n approach enable optimization of both financial & operational parameters
power n approach projects do not enable revenue streams to the detriment of business operational parameters, but rather come to optimize the latter while enabling the former.
March 2020
EET-LED: Commercial
Mills Superspar, PMB, KZN
Scope: Replace existing LED tubes (22W, 160 L/W 6500K) as light levels were not adequate.
Resource Deployed: PRO TECH 160 LED tubes (25W, 160 L/W, 6300K)
Outcome Evaluation: 49.5% average increase in light (lux) levels – from 232 lux to 347 lux @ floor level – crispy white colour, merchandize colours “pop out”, enhanced store aesthetics
November 2015
EET-LED: Commercial
OK Foods Lichtenberg, NW
Scope: Retrofit existing OSRAM fluorescent tubes, reduce electricity costs,
Resource Deployed: PRO SERIES LED tubes (25W, 110 L/W, 6500K)
Outcome Evaluation: 95% average increase in light (pupil lux) levels – from 593 pupil lux to 1,145 pupil lux @ floor level – 5 years after no product failures, client still very happy with light levels
August 2019
EET-LED: Commercial
BBS MICA, Ballito, KZN
Scope: Retrofit existing OSRAM fluorescent tubes, & OSRAM LED tubes.
Resource Deployed: PRO GLOW LED tubes (24W, 110 L/W, 6500K)
Outcome Evaluation: 35% average monthly consumption (kWh) decrease (like for like month) on actual electricity bills, retrofit cost breakeven achieved after 10 months – enhanced aesthetics, lower instore heat levels
September 2019
VPM: Electrical
Moffett Retail Park, Port Elizabeth, EC
Scope: main power supply/main DB/metering to shops of new extension (5 shops - 5,500 m2 – 1,300A total electrical supply).
Resource Deployed: VPM (project management) & IMI (metering).
Outcome Evaluation: optimized procurement of material, rationalization of design, able to deliver project at a cost below R1 million.
March 2018
IMI: Residential
Parks @ Grosvenor, Craighall Park, Johannesburg, GP
Scope: provide IMI for 24-unit residential complex.
Resource Deployed: IMI enabling municipal bill reconciliation & easy tenant billing
Outcome Evaluation: detected municipal overcharging, provides tenant billing transparency, load limiting function enabled rental recovery
April 2018
IMI: Commercial
Moffett Retail Park, Port Elizabeth, EC
Scope: bulk supply/sub metering of blue-chip tenants, monthly electricity account of R600k.
Resource Deployed: IMI platform enabling municipal bill reconciliation easy tenant billing, & real monitoring of substations
Outcome Evaluation: effective tenant billing, identified overloading of substation, provided critical data required for solar array design.
March 2020
VPM: Electrical
Time Square Shopping Centre, Port Elizabeth, EC
Scope: electrical works for blue cheap tenant undertaken from landlord (client).
Resource Deployed: VPM was deployed by rationalizing & optimizing electrical drawings
Outcome Evaluation: from initial cost of R730k to a revised cost of 581k (26%) by rationalizing & optimizing design while producing material of higher quality from those initially quoted.
EET-LED: Industrial
Essmor Meat Distributors, Boksburg, GP
Scope: Retrofit existing OSRAM fluorescent tubes, & OSRAM LED – refrigerated environment.
Resource Deployed: PRO VDE LED tubes (24W, 110 L/W, 6500K) – aluminium heatsink enclosed in pc tube.
Outcome Evaluation: crispier brighter light, enhanced lighting levels, increased productivity